Student Services Building
Slideshow
This slideshow contains 8 slides that will change every 8 seconds. The first button is to play and pause the slideshow, followed by buttons to go to the previous slide, next slide, or choose individual slides.
The Administration Replacement Building symbolizes the aspirations and mission of the university and will serve as the campus “front door” for prospective students, returning students, alumni and visitors. It will house the office of the president, division of university advancement, and divisions of academic, student and administrative affairs. The undulating roof design is inspired by the surrounding hills and mountains, branding the building both as a campus landmark and a memorable place of arrival. The roof also serves a primary and essential role in passive solar design. Its perforated overhangs shade the exterior glass, reduce thermal loads and glare, and maximize good quality daylight. Other passive and mechanical sustainable strategies serve to optimize visual and thermal comfort, operational flexibility and aesthetic sensitivity.
Construction is expected to begin summer 2016 and expected to conclude in fall 2018.