Winter 2017
 California State Polytechnic University, Pomona
IME 112 Introduction to Industrial & Manufacturing Engineering
 3/8/2017
Instructor: Dr. Phillip R. Rosenkrantz, IME Department
Office Phone:
909-869-2553, Office FAX: 909-869-2564
Office:
9-145, email: rosenkrantz@cpp.edu Homepage: http://www.cpp.edu/~rosenkrantz

Office Hours: Mon & Wed 1:30 - 2:30 p.m. Click here for complete schedule - email first if convenient. (Policies and Procedures).

Book: The MIT Guide to Science and Engineering Communication (MIT),
2nd Edition, James G. Paradis and Muriel Zimmerman, June 2002, ISBN10: 0-262-66127-6
Book: The Lean Enterprise Memory Jogger (LEMJ), Goal QPC, 2002, ISBN10:1-57681-045-3
Book: The Time Diet (TD), Emily Schwartz, 2012, ISBN 0985053607
IME 112 PowerPoint Handouts - Either provided or download from Blackboard

Day

Date

Read Prior to Class

Description
(All assignments are due by class time on the date shown unless indicated otherwise)

Bb Reading & Video Quizzes

Bb Discussions and Team Assignments

Self-Analysis
Find in Bb

Surveys.
Find in Bb

M

1/2

-

New Years Holiday

-

-

-

-

W

1/4

-

Introduction, Overview of IME

-

-

-

Survey 1 – Info (due Thurs, 1/5, 11:45 pm)

M

1/9

TD 1-38
MIT 147-150

Study Skills - Part 1 & 2 
How to Study

Bb Reading Quiz 1

Bb Discussion 1 - Confronting Current Issues

-

(Begin Time Tracker for Self Analysis 2 &
Survey Assignment 2)

W

1/11

TD 43-70

Study Skills - Part 2 & 3 
How to Study

Bb Reading Quiz 2

-

Self-Analysis 1 – Myers Briggs

-

M

1/16

-

MLK Holiday

-

-

-

-

W

1/18

-

In-Class Team Meeting #1 - Getting more acquainted and organized. Team Report.

-

Bb Discussion 2 - Five Dysfunctions
Team Report 1

-
-

M

1/23

TD 71-89

Introduction to Teamwork & High Performance Team Meeting Format

Bb Reading Quiz 3

-

Self-Analysis 2 - Time Tracker.

-

W

1/25

LEMJ Ch. 1,2

In-Class Team Meeting #2 – Getting organized. Team Project Assigned.

-
Team Report 2
Self-Analysis 3 - Communications

-

M

1/30

Video
MIT 166-167

Topic - Gantt Charts, Lean, 5S, Kaizen

Bb Video Quiz

Team Report 3

-

Survey 2 – Personal Time Plan

W

2/1

LEMJ Ch. 4, 5, 9

Topic - Flow charts, Value Stream Maps

-

Bb Discussion 3 - Time Killers 1
Team Report 4 - Gantt Chart

-
-

M

2/6

LEMJ Ch. 3

Topic - Queuing Theory/Team Mtgs

-

Team Project Proposal Presentations (Due noon in File Exchange)

-

 

W

2/8

LEMJ Ch. 8

Topic - Work, work measurement-

-

-

-

Survey 3 - Mid Team Eval (11:45 pm)

M

2/13

LEMJ Ch. 7, 9 

Topic - Quality vs. Cost, Problem Solving, Quality Tools

-

-

-

-

W

2/15

MIT Ch. 6, 15 ppt

Topic - Presentation skills

-

-

-

-

M

2/20

-

Team Presentations 1

-

Projects due in Bb by noon

-

-

W

2/22

-

Team Presentations 2

-

-

-

-

M

2/27

-

(Independent study)

-

Discussion 4 - Time Killers 2

-

-

W

3/1

-

(Independent study)

-

-

-

Survey 4 - Final Team Eval (11:45pm) 

M

3/6

-

Team Presentation Review, Activity Reports

-

Discussion 5 - Activity Reports

-

-

W

3/8

-

Senior Project Presentation Preview

-

-

-

-

Take Home Final Exam Due--uploaded to Blackboard
Section 01 -Wednesday , March 15, by 3:40 PM

Survey 5-Outcomes (link sent via email) Due 3/15, 3:40 PM

Assignments
Grading will be based on the following (500 points possible. 5 points = 1%.
Final Grade Calculation
)
Points
%

Individual Assignments, Threaded Discussions, Surveys, Reading Quizzes (Note that none of these activities is difficult. However deadlines must be met if you want the points. Students that blow off or forget these assignments will lower their grade significantly).

Reading and Video Blackboard Quizzes (40 points)
Time Diet 1 (10 points)
Time Diet 2 (10 points)
Time Diet 3 (10 points)
Video Quiz (10 points)

Blackboard Discussions (75 points)
Discussion 1 – Myths & Excuses (15 points)
Discussion 2 - Five Dysfunctions of a Team (15 points)
Discussion 3 – Time Killers 1 – Experiment (15 points)
Discussion 4 – Time Killers 2 – Results (15 points)
Discussion 5 -- Activities Reports (15 points)

Self-Analysis Questionnaires & Assessment (60 points)
Self Analysis 1 -- Questionnaire 1 – 16 Personalities (Myers-Briggs)  (20 points)
Self Analysis 2 – Upload spreadsheet – Time Tracker (20 points)
Self Analysis 3 -- Questionnaire 2 - Communications (20 points)

SurveyMonkey Surveys (45 points)
Survey 1 – Info Survey (10 points)
Survey 2 – Personal Time Plan Survey (10 points)
Survey 3 – Mid-Project Team Evaluation Survey 1 (5 points)
Survey 4 – Post-Project Team Evaluation Survey 2 (5 points)
Survey 5 - IME 112 Outcomes Assessment (link sent via email) (15 points)

220

44%

Team Projects (individuals must be present to receive credit)
Team Reports for 1/18, 1/25, 1/30, 2/1 - (5 points each)
Proposal Presentation – 10 points
Class Presentation – 100 points (grade may vary by student)

130

26%

Class Participation (attendance) and Participation in Team Meetings -2% (10 points) for each unexcused absence (This may seem like a heavy weight for absences. The rationale is that teamwork requires team members to be present. Missing one team meeting can put someone out of the loop for the rest of the project).

50

10%

Final Exam (Take home exam released in the 10th week - submit in Bb)

100

20%

Total Possible
500
100%