Construction workers pave the new Kellogg Drive road.

Archive

Previous Newsbreaks about construction, maintenance and repair projects that have impacted the campus community.

Great California Shake Out Drill Scheduled on Oct. 17 at 10:17 a.m.

HVAC Interruption on First Floor of Building 17

Move Vehicles From CLA and Voorhis Circle Today by 4 p.m. 

Asphalt Replacement Near SSB Scheduled on Wednesday, Oct. 9

Elevator in CLA Classroom Side Back in Service

Repairs to HVAC System in Building 17 Completed 

HVAC Interruption on Second Floor of Building 17

Electrical Project to Close Section of Lot B Starting on Thursday, Sept. 19 

Fire Alarm Tests Scheduled in CLA Complex on Wednesday, Sept. 4

Air Handler Replacement Project to Start in Bronco Bookstore

Reclaimed Water Flow Meter Project to Start on Monday, July 15

Chilled Water Line Installation Near BSC to Begin on Tuesday, July 16

Installation of Protective Netting at Scolinos Field to Start on Monday, July 1

Classroom in Building 3 to Close for Ventilation Project

Construction of Fume Hood Additions Begins in College of Science

Part of Lot B to Close for Electrical Project Starting on Thursday, Sept. 12 

Natural Gas Shutoff in Four Buildings Scheduled on Tuesday, Sept. 3 

Repairs Underway in First-Floor Restroom at University Library

Ventilation, Air-Conditioning Service Restored in Bronco Bookstore Building

HVAC Outage on Second Floor of Bronco Bookstore Building 

Demolition of Building 90 to Close One Entrance of Parking Lot F4

Elevator in Classroom Side of CLA Out of Service

Hot Water Shutoff in College of Science Scheduled on Saturday, Aug. 24 

Brief Power Shutdowns Scheduled in Six Buildings on Friday, Aug. 16 

Fire Alarm Tests Scheduled in Biotechnology Building on Thursday, Aug. 15 

Exterior Lighting Replacement at Agriscapes, Farm Store to Start on Wednesday, Aug. 14

College of Science HVAC System to Undergo Repairs on Saturday, Aug. 3

Water Shutoff Scheduled at Center for Regenerative Studies on Saturday, Aug. 3

Elevators in Four Buildings Out of Service 

Fire Alarm Tests in CLA Tower Scheduled on Thursday, Aug. 1 

Repairs Completed on HVAC System in CLA Classroom Side 

Repairs on HVAC System in CLA Classroom Section Underway 

Bronco Bookstore to Undergo Power Shutoff on Monday, July 22 

Electricity Restored to Most Buildings Interrupted by Power Outage 

Fire Alarm Tests in CLA Building Scheduled Starting Friday, July 19 

Filming of Video Scheduled at SSB and Lyle Center on Thursday, July 18

Section of Eucalyptus Lane to Close Saturdays Starting on June 22 

Water Restored to College of Engineering After Completion of Repairs 

Repairs Force Water Shutoff in Section of College of Engineering

Filming Scheduled at Kellogg Arena on Thursday, July 11 

Power Outage Hits 15 Campus Buildings 

Elevators Back in Service in College of Engineering and University Library 

Elevators in College of Engineering and University Library Out of Service

De-Ionized Water Restored in Four Buildings 

Mitigation Initiatives In Place for Storms

Work on HVAC System in SSB Building Scheduled on Friday, June 21 

Building 13 Men's Restroom Reopens After Completion of Repairs 

De-Ionized Water Supply Shut Off in Four Buildings

Work on HVAC System in SSB Building Scheduled on Friday, June 21 

Additional Fire Alarm Tests in CLA Building Scheduled Starting Friday, June 14

Series of Fire Alarm Tests in CLA Building to Begin on Saturday, June 1 

Elevator Repairs in Building 1, University Library Start on Monday, May 20

Building 1 HVAC System to Undergo Repair Starting on Monday, May 20 

Elevator No. 2 in College of Engineering Out of Service on Wednesday, May 22

De-Ionized Water to Be Shut off in College of Science on Tuesday, May 21 

Repairs Underway to Elevator No. 3 in College of Engineering 

Repairs Completed on Elevator No. 3 in Biotechnology Building 

Section of Sidewalk Between SSB and Library Requires Additional Work

Elevator No. 3 Out of Service in Building 4 

Sidewalk Between SSB and Library to Undergo Repair on Friday, May 3 

All Restrooms in Building 2 Closed for Plumbing Repairs

Repairs Continue on Elevator No. 2 in University Library 

Building 89 Sewer System to Undergo Repairs Starting April 2

Buildings 26 and 79 to Undergo Fire Alarm Tests on Thursday, March 21 

Take Detours Around Water Line Repair Near Student Services Building

Testing of Fire Alarms in 13 Buildings Set for Saturday, March 16 

Fire Alarm Testing in Five Buildings Scheduled on Friday, March 15  

Fire Alarms in Five Buildings to Be Tested on Thursday, March 14 

Elevator Out of Service in Building 1

Fire Alarm Testing in Three Buildings Scheduled on Wednesday, March 13

Four Buildings to Undergo Alarm Testing on Tuesday, March 12 

Fire Alarm Tests in University Library to Resume on Thursday, March 7

Additional Fire Alarm Testing Set for Building 4 on Saturday, March 9

Water Shut Down in Darlene May Gym for Pipeline Repair 

University Library to Undergo Fire Alarm Testing on Tuesday, March 5

Building 4 to Undergo Fire Alarm Testing on Saturday, March 2 

Fire Alarm Tests in Buildings 7, 35A and 109 Set for Wednesday, Feb. 27

Restrooms in Building 89 Temporarily Out of Service 

Additional Fire Alarm Testing Scheduled in Building 7 and Building 8

Building 8 to Undergo Fire Alarm Tests on Friday, Feb. 22 

Fire Alarm Tests in Building 9 Scheduled on Monday, Feb. 25 

Fire Alarm Testing in Buildings 7 and 79 Set for Thursday, Feb. 21 

Fire Alarm Testing Scheduled in Building 45 on Thursday, Feb. 14

CLA Classroom Side Elevators Out of Service

Additional Fire Alarm Testing in Building 211 on Wednesday, Jan. 30 

Eastbound 10 Freeway Connector Lanes to 57 Freeway Closure 

Fire Alarm Testing Scheduled in Buildings 26, 79 and 211 on Friday, Jan. 25 

Traffic Lane Merger, Bike Lane Closure on Kellogg Drive Starting Monday, Dec. 10 

Fire Alarm Testing Scheduled in Buildings 24, 26 and 193 on Friday, Jan. 11 

Electrical Interruptions and Outages on Saturday, Jan. 5 

Elevator Out of Service in Building 98 

2018 Archive